Buyers evaluate proposals on price and timeline and inspect the resulting code rarely, if at all. Yet the codebase is the durable asset, and its condition determines what the next phase costs and whether you can change supplier without starting over.
Set expectations before work starts
Quality standards are cheap to agree at the beginning and awkward to introduce later. Keep the list short and enforceable rather than aspirational.
- Automated tests for the parts of the system where failure is expensive.
- A README that lets a new developer run the project locally.
- Code review before merge, by someone other than the author.
- Documented environment setup and deployment steps.
Insist on continuous handover, not a final one
Handover treated as an end-of-project event is a risk concentrated at the worst possible moment. Instead require that the project is always handover-ready: code in your repository, documentation current, deployment reproducible by someone outside the team. Test the claim occasionally by having someone unconnected follow the setup instructions.
Ask for evidence you can verify
Rather than asking whether tests exist, ask for the coverage report and the CI pipeline output. Rather than asking whether reviews happen, look at the pull request history. The point is not distrust; it is that verifiable answers are more useful than assurances, and good suppliers are pleased to provide them.
Budget for the unglamorous work
If every sprint is fully allocated to features, quality work does not happen and the debt is real. Allocating a modest, standing share of capacity to maintenance, upgrades and test coverage is cheaper than the eventual remediation project.
Have someone technical look at it
If nobody on your side can assess the codebase, arrange an independent review at a couple of points. A short engagement by an experienced developer will tell you more about what you are buying than any status report, and it is inexpensive relative to what it protects.

